Home Company Info Product List Contact Details
Homeproduct Directory

SH Anti-acid coating

SH Anti-acid coating
company Changzhou Zhongbang Chemical Group Co., Ltd.
Categories LED Displays
Update2011-03-21
Original RegionChina
SH Anti-acid coating
Description:
Product description
  1. Based on the hydroxide radical that contain epoxy, special resin,anticorrosion filler and pigment, addition agent, isocyanate etc. A and Bcomponents packaged. A component is the paint vehicle of the primer, middlecoat and cover; B component is the curing agent of the primer, middle coatand cover.
  2. This paint has a strong anticorrosion ability against the acid, slatalkali and other chemical atmosphere. Strong ablity against the water, oil,heat and solvent.
  3. The film is tough, bright with good decorative and protectiveability.The film can solidfy under room temperature or low temperature. Highsolid content; easy application.

Recommended uses

  1. Used for the anticorrosion of the steel structure in the acid cleaningplant.
  2. Also suitable for the hot dip plant, galvanoplastics plant, petrochemicalindustry, equipment, pipe, store tank.

Physical parameter

Color

Primer:Iron red; Middle: chocolatebrown;Cover: all color

Glossy

Primer:mat; middle:mat; cover:semiflat

Theoretic coverage

Primer:140g/ m; middle:140 g/ m; cover:120g/ m

Specific gravity

Primer:1.55; middle:1.50; cover:1.50

Desiccation time

23±2surface dryness:2h,Actual dryness:24h

Flash point

Acomponent: Primer:32℃; middle:33℃; cover:26℃,Bcomponent:30℃

Storage

6 months

Operation description

Mixing ratio

PrimerA:B=3:1;
MiddleA:B=3:1
CoverA:B=2.5:1

Curing time

23±220 minutes

Applicable time

23±24~8hours

Thinner

Specialthinner

Operation method

Airless spray

Air spray

Manual brushing /Roller coat

Max dilution

≤ 5%

Spout size

20P20

Blowout pressure

195kg/cm2

Tool cleaning

Specialthinner

Film thickness

Primer:Wetfilm: 90mDryfilm: 40m
Middle: Wet film:95mDryfilm: 40m
Cover:Wet film: 90mDryfilm: 35m

Operation interval

Primer:

23±2Min 2 hours; Max 48 hours

Surface treatment

Ball blast or sand blast of the steel surface till the Sa2.5 grade. Ordescaling by hand or electric tool till St3 grade.
Clean the dust and other deposit builder.
Paint the primer at once after cleaning to avoid the rusting again.

Operationcondition

  1. Temperature of environment:5~35℃andthe RH should below 85%.
  2. Stop operatingin thehurricane,rain or fog and so on

SH Anti-acid coating on sale

Products Showcase

See more products from this supplier.

Do you want to show products of your own company? Join FREE now!

You may also be interested in: